Teams have extended the current hold in the countdown beyond the planned 1.5 hours. Supply has been reestablished of gaseous nitrogen used to purge oxygen from the rocket prior to tanking operations to ensure a safe environment for propellant loading, but teams need additional time to switch supply from air back to the gaseous nitrogen and to discuss confidence in the supply. When the countdown resumes, it will pick up at T-6 hours, 40 minutes.
Month: April 2022
Artemis I Update: Mission Management Team “Go” to Proceed with Tanking Pending Resolution of Gaseous Nitrogen Supply Issue
The mission management team chair has given a “go” to proceed with tanking the rocket for the Artemis I wet dress rehearsal test, pending resolution of an issue with an outage at an off-site vendor of gaseous nitrogen used inside the rocket before propellant loading. While a similar issue with a supplier of gaseous nitrogen was experienced during a previous test attempt April 4, teams expect the supply to be reestablished shortly. Following resolution of the issue, the launch director will give the “go” to officially begin the tanking process. Meteorologists with Space Launch Delta 45 said there were no weather constraints for the test.
Tanking begins with chilling down the liquid oxygen lines for the core stage. In sequential fashion, liquid oxygen (LOX) and liquid hydrogen (LH2) will flow into the into the rocket’s core stage tank and be topped off and replenished as some of cryogenic propellant boils off. The team also will conduct leak checks to ensure propellant loading is proceeding as expected. Only minimal cryogenic operations are being conducted on the interim cryogenic propulsion stage because of an issue with a helium check valve found several days ago which cannot be fixed at the launch pad. Teams will chill down the lines used to load propellant into the upper stage but not flow any actual propellant to the stage.
NASA is streaming live video of the rocket and spacecraft at the launch pad on the Kennedy Newsroom YouTube channel. Venting may be visible during tanking operations. NASA is also sharing live updates on the Exploration Ground Systems Twitter account.
Artemis I Update: Rocket’s Upper Stage and Boosters Powered Up, Countdown On Track
The Space Launch System rocket’s interim cryogenic propulsion stage (ICPS) and boosters were powered up overnight. Teams are in the process of clearing all non-essential personnel from the launch pad area in preparation for propellant loading operations.
At 6 a.m. EDT, or L-8 hours, 40 minutes, the launch team is expected to reach a planned 1 hour, 30-minute built-in hold. During this time the mission management team will review the status of operations, receive a weather briefing, and make a “go” or “no-go” decision to proceed with tanking operations.
Tanking milestones include filling the rocket’s core stage with several hundred thousand gallons of liquid oxygen and liquid hydrogen. This will occur over a series of different propellant loading milestones to fill, top off, and replenish the tank. Because of an issue found several days ago with a helium check valve on the rocket which cannot be fixed at the launch pad, cryogenic propellant will not be loaded into the rocket’s upper stage.
NASA is streaming live video of the rocket and spacecraft at the launch pad on the Kennedy Newsroom YouTube channel. NASA is also sharing updates on the Exploration Ground Systems Twitter account.
The next blog update will be provided after the “go” or “no-go” decision to proceed with tanking operations.
Artemis I WDR Update: Final Umbilical Preparations Complete for Artemis I
Final preparations on the umbilicals to ensure connectivity between the mobile launcher, the Space Launch System rocket and Orion spacecraft were completed this evening.
The umbilicals provide power, communications, coolant, and fuel to different parts of the rocket. Additional accessories provide access and stabilize the rocket and spacecraft. During launch, each umbilical releases from its connection point, allowing the rocket and spacecraft to lift off safely from the launch pad.
Teams have also completed a final walkdown at the pad to verify the rocket and ground equipment are in the correct configuration for tanking operations checking to ensure no foreign object debris is present near the rocket that could present a hazard during the test.
The next update will be provided in the morning of April 14, prior to the mission management team’s pre-tanking briefing where they will review the status of operations and determine if they are “go” to proceed toward tanking operations.
Real-time updates will be provided on the Exploration Ground Systems Twitter account with “go” for tanking targeted on April 14. NASA is also streaming live video of the rocket and spacecraft on the Kennedy Newsroom YouTube channel.
Artemis I Update: Weather Still Favorable for Artemis I Wet Dress Rehearsal
The mission management team for Artemis I met this morning to review the status of operations and continues to press ahead toward terminal countdown for the wet dress rehearsal test. Meteorologists with the U.S. Space Force Space Launch Delta 45 currently predict favorable weather conditions for tanking on April 14. There is currently a 5% chance of lightning within five nautical miles of the launch pad when tanking begins. Weather constraints stipulate there must be less than a 20% chance lightning within 5 nautical miles of pad during the first hour of tanking. Winds must not be above 37.5 knots and the temperature cannot be below 41 degrees Fahrenheit.
Later today teams will perform a pre-launch walkdown of the rocket and ensure the Space Launch System’s core stage is prepared for the upcoming loading operations.
NASA will provide live updates on the Exploration Ground Systems Twitter account. NASA is also streaming live video of the rocket and spacecraft at Launch Pad 39B on the Kennedy Newsroom YouTube channel.
Artemis I Update: Preparations Continue, Rocket’s Core Stage Powered Up
Overnight, launch controllers powered up the Orion spacecraft and the Space Launch System rocket’s core stage. Communications links between Orion and the Mission Control Center at Johnson Space Center in Houston were verified, and preparations of the four RS-25 engines, which will not be lit during the wet dress rehearsal, continued. Over the next several hours, controllers will charge Orion’s batteries and conduct final preparations and closeout activities for the umbilicals.
The umbilicals provide power, communications, coolant, and fuel to different parts of the rocket. Additional accessories provide access and stabilize the rocket and spacecraft. During launch, each umbilical releases from its connection point, allowing the rocket and spacecraft to lift off safely from the launch pad.
The mission management team is scheduled to meet at 11 a.m. EDT to review the status of operations. The next update will be posted after the conclusion of the meeting.
NASA will provide live updates on the Exploration Ground Systems Twitter account. NASA is also streaming live video of the rocket and spacecraft at Launch Pad 39B on the Kennedy Newsroom YouTube channel.
Artemis I Update: Countdown is Underway for Wet Dress Rehearsal
At approximately 5 p.m. EDT today, the launch team arrived at their stations inside the Launch Control Center at NASA’s Kennedy Space Center in Florida. The countdown will begin 30 minutes later at 5:30 p.m. or L-45 hours, 10 minutes before the initial target T-0 for the wet dress rehearsal test for NASA’s Artemis I mission. Teams are proceeding with a modified test, primarily focused on tanking the core stage and minimal propellant operations on the interim cryogenic propulsion stage (ICPS) with the ground systems at Kennedy. Tanking operations are scheduled to occur on Thursday, April 14.
Meteorologists with the U.S. Space Force 45th Space Wing predict favorable weather for propellant loading operations. Weather constraints stipulate there must be less than a 20% chance lightning within 5 nautical miles of pad during the first hour of tanking. Winds also must not be above 37.5 knots and the temperature cannot be below 41 degrees Fahrenheit.
Overnight, teams will power up Orion and the Space Launch System core stage, charge core stage battery, and prepare the four RS-25 engines, which will not be lit during the test.
During the test, the timing for some events on account of several planned operational demonstrations tied to specific capabilities and test objectives may differ from the day of launch countdown. These demonstrations include tests on the cryogenic systems and an approximately three-minute hold inside the terminal count, which would not normally occur on launch day. If needed, the test team may also hold as necessary to verify conditions before resuming the countdown, or use the test window or extend beyond it, if consumables and resources allow them to complete test objectives.
In addition to updates on this blog, NASA will provide live updates on the Exploration Ground Systems Twitter account. NASA is also streaming live video of the rocket and spacecraft at Launch Pad 39B on the Kennedy Newsroom YouTube channel. Activity at the launch pad will likely not be visible during the majority of the countdown, but some venting may be seen during tanking on April 14.
The next operational update will be posted the morning of April 13.
Artemis I Wet Dress Rehearsal Update
NASA is planning to proceed with a modified wet dress rehearsal, primarily focused on tanking the core stage, and minimal propellant operations on the interim cryogenic propulsion stage (ICPS) with the ground systems at Kennedy. Due to the changes in loading procedures required for the modified test, wet dress rehearsal testing is slated to resume with call to stations on Tuesday, April 12 and tanking on Thursday, April 14. Wet dress rehearsal is an opportunity to refine the countdown procedures and validate critical models and software interfaces. The modified test will enable engineers to achieve the test objectives critical to launch success.
Engineers have identified a helium check valve that is not functioning as expected, requiring these changes to ensure safety of the flight hardware. Helium is used for several different operations, including purging the engine, or clearing the lines, prior to loading propellants during tanking, as well as draining propellant. A check valve is a type of valve that allows liquid or gas to flow in a particular direction and prevents backflow. The helium check valve is about three inches long and prevents the helium from flowing back out of the rocket.
Following the modified test, the Space Launch System rocket and Orion spacecraft will return to the Vehicle Assembly Building (VAB) where engineers will evaluate the valve and replace if needed. Teams are confident in the ability to replace the valve once back in the VAB.
NASA will host a teleconference to discuss details on Monday, April 11. Check back at this blog for an update on the countdown timeline prior to the modified wet dress rehearsal testing for the Artemis I mission. NASA is streaming live video of the rocket and spacecraft on the Kennedy Newsroom YouTube channel.
Artemis I Wet Dress Rehearsal Status
In continued preparations for the Artemis I wet dress rehearsal test, with tanking targeted for Monday, teams encountered an issue maintaining helium purge pressure on the upper stage engine after change-out of a regulator on the mobile launcher. The RL10 engine on the upper stage uses helium to purge the engine and also to activate upper stage valves during wet dress rehearsal operations. After initial troubleshooting, the team reestablished normal helium purge, and is continuing work to determine the cause of a restriction in the helium flow. Engineers will conduct troubleshooting tomorrow to confirm and characterize system performance. If needed, the mission management team will meet Sunday to disposition any adjustments in the procedures or modifications in test objectives as necessary. After the wet dress rehearsal test, SLS and Orion will return to the Vehicle Assembly Building, and engineers will conduct additional inspections of the related flight systems to further evaluate system performance. The Space Launch System rocket, the Orion spacecraft, and the supporting ground system elements remain in stable condition.
The countdown for the two-day test is currently slated to begin with call to stations beginning at 5 pm EDT on Saturday, April 9 with T-0 planned for 2:40 pm on Monday, April 11. While engineers investigate the issue, teams continue to refine the test schedule to account for insights gained during the previous runs and activities, or test objectives, that were completed earlier this week and no longer need to be included in the next test run, such as configuring ground support equipment. Pending additional analysis, NASA expects to have a forward plan tomorrow for wet dress rehearsal testing.
Check back at this blog for an update on wet dress rehearsal testing for the Artemis I mission. NASA is streaming live video of the rocket and spacecraft on the Kennedy Newsroom YouTube channel. Real-time updates will be provided on the Exploration Ground Systems Twitter account with “go” for tanking.
NASA Prepares for Next Artemis I Wet Dress Rehearsal Attempt

Teams are preparing for the next attempt of the Artemis I wet dress rehearsal, pending range availability and restoration of propellants and gases during the test. Through the past two test runs April 3 and 4, engineers accomplished several test objectives that will prepare the teams and integrated systems for launch:
-
- Configuring Launch Pad 39B and the mobile launcher for the test, just as it will have to be prepared for launch
- Clearing personnel and equipment from the launch pad after configuration in order to proceed with propellant loading
- Powering up Orion and the SLS rocket systems in launch configuration, including the solid rocket boosters, the core stage, and the interim cryogenic propulsion stage
- Checking out and verifying the Orion spacecraft countdown and commanding by flight controllers at NASA Johnson Space Flight in Houston
- Checking out the guidance, navigation and control system and all the integrated software that operates across the rocket, Orion, ground systems and ground support centers including the Launch Control Center
- Verifying and checking out all the range safety and systems with the range
- Draining the liquid oxygen and liquid hydrogen after the test
- Powering down the rocket, the spacecraft and ground systems and putting them in a safe configuration
All these activities are necessary for a successful launch or in the event launch controllers decide not to proceed with launch if a technical or weather issue arises during or prior to the countdown. Completing these objectives will allow the team to use the next test opportunity to focus on executing the remaining objectives during dynamic operations, such as loading the cryogenic propellant and working through the launch countdown.
Inspections after the second test showed the vent valve that prohibited the team from proceeding with loading liquid hydrogen was configured physically in a closed position, which prevented it from being commanded remotely to an open position. The valve positioning has since been corrected.
Teams were also able to demonstrate their ability to work through several issues, such as severe weather, delays in getting a gaseous nitrogen supply source provided by a commercial vendor up and running, and fixing systems like fans that did not perform as expected.
NASA’s Space Launch System (SLS) rocket, the Orion spacecraft, and the supporting ground system elements are all in excellent condition and in a configuration that supports the next opportunity.
Listen to a replay of the latest briefing, and check back at this blog for an update on the targeted date for resuming WDR testing for the Artemis I mission.