SpaceX’s Dragon spacecraft, named Endurance, atop the company’s Falcon 9 rocket, stands tall at the pad at Launch Complex 39A at NASA’s Kennedy Space Center in Florida on Monday, Aug. 21, 2023. NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov, who arrived at Kennedy on Sunday, Aug. 20, 2023, will fly to the International Space Station on NASA’s SpaceX Crew-7 mission. Photo credit: SpaceX
NASA and SpaceX are targeting 3:27 a.m. EDT Saturday, Aug. 26, for launch of the agency’s Crew-7 mission to the International Space Station.
Mission managers met on Thursday to discuss the status toward final readiness for a Friday launch opportunity. After performing an extra data review, teams decided to take additional time to reconfirm required factors of safety and operational margin on one of the Dragon spacecraft’s environmental control and life support system (ECLSS) components. The new launch date provides teams additional time to complete the analysis and thoroughly review the necessary data ahead of launch. All ECLSS valves on the Crew-7 and Crew-6 Dragon spacecraft are performing normally, and performed as expected in all preflight testing. Safety continues to be the team’s top priority. The Falcon 9 rocket and Dragon spacecraft remain healthy as teams complete and discuss the final results of this additional analysis, and the crew is ready to fly when the entire team is ready.
For a launch on Saturday, the U.S. Space Force 45th Weather Squadron predicts a 95% chance of favorable weather conditions at the launch pad for liftoff based on Falcon 9 Crew Dragon launch weather criteria.
The Dragon spacecraft carrying NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will launch atop the SpaceX Falcon 9 rocket from Launch Complex 39A at NASA’s Kennedy Space Center in Florida.
The Dragon spacecraft, named Endurance, is scheduled to dock to the space station at 8:50 a.m. Sunday, Aug. 27.
Live coverage of Crew-7 activities begins at 11:30 p.m., Friday, Aug. 25, on NASA Television and the agency’s website. Follow along for details about the mission and NASA’s Commercial Crew Program on the Crew-7 blog, the commercial crew blog,@commercial_crew on X, and commercial crew on Facebook.
NASA and SpaceX are standing down from the Friday, Aug. 25, launch opportunity for the agency’s Crew-7 mission to the International Space Station. Launch now is targeted at 3:27 a.m. Saturday, Aug. 26, for SpaceX’s seventh crew rotation mission to the microgravity laboratory for NASA. More to come.
NASA’s SpaceX Crew-7 crew members are photographed in the Dragon Endurance spacecraft during a dry dress rehearsal at the agency’s Kennedy Space Center in Florida on Aug. 22, 2023. From left are Roscosmos cosmonaut Konstantin Borisov, ESA (European Space Agency) astronaut Andreas Mogensen, NASA astronaut Jasmin Moghbeli, and JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa. Photo credit: SpaceX
NASA, SpaceX, and international partners have completed the launch readiness review for the agency’s Crew-7 mission to the International Space Station. Crew-7 managers gathered at NASA’s Kennedy Space Center in Florida at 9 p.m. EDT Wednesday to review the SpaceX Falcon 9 rocket and Dragon spacecraft readiness and decided launch is “Go” for liftoff to the space station. Launch now is targeted for 3:50 a.m. EDT Friday, Aug. 25, from Kennedy’s Launch Complex 39A. If needed, a backup launch opportunity is available at 3:27 a.m. Saturday, Aug. 26.
On Wednesday, rocket and ground systems engineering teams completed the detailed data reviews following the integrated static fire of the Falcon 9 rocket conducted the day before at Launch Complex 39A. Falcon 9 performance was normal, resulting in a successful full duration static fire of all nine Merlin first-stage engines.
Operations teams are not tracking any major issues with Falcon 9 or the Dragon spacecraft. NASA and SpaceX spent Wednesday working toward final launch readiness, with remaining work expected to be completed ahead of launch.
The International Space Station Program is monitoring the potential need for a debris avoidance maneuver early afternoon Thursday, Aug. 24, for the orbital outpost. Space station mission control trajectory teams are tracking the debris and determining whether a short duration burn of the station’s thrusters would be required. If needed, the maneuver is not expected to impact the planned arrival of the Roscosmos ISS Progress cargo spacecraft also on Thursday. More information will be provided as orbital trajectory teams review the data and determine whether the debris would fly in the vicinity of the space station requiring a change in station’s altitude.
NASA’s SpaceX Crew-7 crew members arrive at Launch Complex 39A during a dry dress rehearsal at the agency’s Kennedy Space Center in Florida on Aug. 22, 2023. Photo credit: SpaceX
On Tuesday, Crew-7 NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov participated in a rehearsal of launch day activities in preparation for the upcoming Crew-7 launch.
Rehearsal began with launch teams assisting Crew-7 crewmates into their SpaceX spacesuits inside the Astronaut Crew Quarters at Kennedy’s Neil A. Armstrong Operations and Checkout Building – just as they will on launch day. Next, the crew took the elevator down to the ground floor and exited the building’s double doors, where Tesla Model X vehicles were waiting to drive them the short distance to the launch site.
After they arrived at the launch pad, Moghbeli, Mogensen, Furukawa, and Borisov rode the launch tower’s elevator up to the crew access arm – the walkway they will use to enter Dragon, named Endurance. Once securely seated inside, the crew members checked their communications systems and performed seat rotation and suit leak checks. The rehearsal concluded with closure of the spacecraft’s side hatch, which normally occurs about one hour and 25 minutes before liftoff.
Forecasters with Cape Canaveral Space Force Station’s 45th Weather Squadron predict a 90% chance of favorable weather conditions for launch, with the cumulus cloud rule serving as the primary weather concern.
Starting at 11:45 p.m. EDT Thursday, Aug. 24, the live broadcast of the mission – including liftoff and postlaunch milestones – will air on NASA Television and the agency’s website. Check the Crew-7 blog starting at 11 p.m., for key events leading up to launch and through spacecraft separation.
We’ll keep you updated on the key milestones throughout this mission. Details about the mission and NASA’s Commercial Crew Program can be found by following the Crew-7 blog, the commercial crew blog, @commercial_crew on X, and commercial crew on Facebook.
The Dragon Endurance spacecraft for NASA’s SpaceX Crew-5 mission arrives at the hangar at Kennedy Space Center’s Launch Complex 39A in Florida on Sept. 23, 2022. The capsule arrived at the launch complex after making the short journey from its nearby processing facility at Cape Canaveral Space Force Station. Photo credit: SpaceX
NASA and SpaceX are targeting no earlier than 12:23 p.m. EDT Tuesday, Oct. 4, for the launch of the agency’s Crew-5 mission to the International Space Station with a backup opportunity on Wednesday, Oct. 5.
Mission teams will continue to monitor the impacts of Ian on the Space Coast and NASA’s Kennedy Space Center in Florida and could adjust the launch date again, as necessary. More updates on the planning schedule, including crew arrival from the agency’s Johnson Space Center to Kennedy, will be provided more in the coming days. Based on current schedules, crew arrival is planned no earlier than Friday, Sept. 30. The safety of the crew, ground teams, and hardware are the utmost importance to NASA and SpaceX.
The Dragon Endurance spacecraft is currently mated to the Falcon 9 rocket and safely secured inside SpaceX’s hangar at Launch Complex 39A. Kennedy Space Center is also making preparations across the spaceport to secure other property and infrastructure. After the storm progresses, teams from NASA and SpaceX will evaluate the potential impacts to the center and determine whether to adjust the mission timeline further.
Undocking of the agency’s Crew-4 mission from the space station will move day-for-day along with the Crew-5 launch date to allow a planned five-day direct handover between crews.
The Crew-5 flight will carry NASA astronauts Nicole Mann and Josh Cassada, who will serve as mission commander and pilot, respectively, along with JAXA (Japan Aerospace Exploration Agency) astronaut Koichi Wakata, and Roscosmos cosmonaut Anna Kikina, who will serve as mission specialists.
Follow the Crew-5 blog for the latest information on the mission and weather impacts. Learn more about Crew-5 by exploring the Commercial Crew Press Kit.
A SpaceX Falcon 9 rocket with the company’s Dragon Endurance spacecraft for the Crew-3 mission is vertical at Launch Pad 39A at NASA’s Kennedy Space Center in Florida on Oct. 27, 2021. Also in view is the crew access arm. Endurance will carry astronauts to the International Space Station for NASA’s SpaceX Crew-5 mission, which is targeted to launch no earlier than Sept. 29, 2022. Photo credit: SpaceX
NASA and SpaceX are preparing for the fifth crew rotation mission of the company’s human space transportation system to the International Space Station as part of the agency’s Commercial Crew Program (CCP).
NASA’s SpaceX Crew-5 mission is targeted to launch no earlier than Sept. 29, 2022, to the microgravity laboratory for a science expedition mission with NASA astronauts Nicole Mann and Josh Cassada, JAXA’s (Japan Aerospace Exploration Agency) Koichi Wakata, and Roscosmos cosmonaut Anna Kikina.
A launch at the end of September will allow SpaceX to complete hardware processing and mission teams will continue to review the launch date based on the space station’s visiting spacecraft schedule. Launch of Crew-5 now will take place after a scheduled Soyuz undocking and launch period from Sept. 16-30.
Crew-5 astronauts will fly to the space station in Dragon Endurance, currently undergoing refurbishment for its second human spaceflight at SpaceX’s processing facility in Cape Canaveral, Florida. The spacecraft previously flew the agency’s Crew-3 mission to and from the space station. As part of the refurbishment process, teams will install new components such as the heat shield, parachutes, and pod panels.
This also will be the first time all four forward bulkhead Draco engines, which orient and provide altitude adjustment for the spacecraft during flight, are reused on a NASA commercial crew mission. SpaceX recently completed Dragon’s propulsion system checkouts and will soon mate the heat shield to the spacecraft. Once refurbishment is complete, Dragon will be stacked to its trunk ahead of transporting the vehicle to SpaceX’s hangar at Launch Complex 39A (LC-39A) at NASA’s Kennedy Space Center in Florida.
As teams progress through Dragon milestones, they also are preparing a first-flight Falcon 9 booster for this mission. SpaceX is removing and replacing the rocket’s interstage and some onboard instrumentation after the hardware was damaged during transport from SpaceX’s production factory in Hawthorne, California, to the company’s McGregor test facility in Texas for stage testing. SpaceX teams completed – and NASA teams reviewed – load, shock, and structural analyses, coupled with detailed and X-ray inspections, to verify the damage was isolated to the interstage and ensure the integrity of the rest of the booster.
After all replacement hardware is installed, the booster will undergo stage testing and be further assessed prior to acceptance and certification for flight.
Once all rocket and spacecraft system checkouts are complete and all components are certified for flight, teams will mate Dragon to the Falcon 9 rocket in SpaceX’s hangar at LC-39A. The integrated spacecraft and rocket will then be rolled to the pad and raised to vertical for an integrated static fire test prior to launch.
Follow the commercial crew blog for the latest information on Crew-5 progress and flight readiness as reviews and milestones continue. NASA and its partners will host a media event in the coming weeks to discuss more about Crew-5 progress.