Four Expedition 69 flight engineers aboard the International Space Station pose for a portrait in their pressure suits. Clockwise from bottom, are NASA astronaut Stephen Bowen; UAE (United Arab Emirates) astronaut Sultan Alneyadi; NASA astronaut Woody Hoburg; and Roscosmos cosmonaut Andrey Fedyaev. Photo credit: NASA
NASA and SpaceX are standing down from the Saturday, Sept. 2, departure opportunities for the agency’s Crew-6 mission from the International Space Station due to unfavorable weather conditions near the splashdown sites off the coast of Florida. The next available undocking opportunity is no earlier than 7:05 a.m. EDT on Sunday, Sept. 3, with a splashdown no earlier than 12:07 a.m. on Monday, Sept. 4, pending weather evaluations.
Mission teams will meet Friday evening to determine the viability of the next Crew-6 undock target. The Dragon spacecraft, named Endeavour, remains healthy while currently docked to the space station as Crew-6 prepares for their return trip to Earth completing a nearly six-month science mission in orbit.
Crew-6’s Dragon undocking depends on a variety of factors, including spacecraft readiness, recovery team readiness, weather, sea states, and other factors.
NASA will provide more information about live coverage of the upcoming return activities for the Crew-6 mission with NASA astronauts Stephen Bowen and Woody Hoburg, as well as UAE (United Arab Emirates) astronaut Sultan Alneyadi, and Roscosmos cosmonaut Andrey Fedyaev.
NASA TV coverage for the Sept. 3 undocking and Sept. 4 splashdown opportunity, if it is chosen, will be:
Sunday, Sept. 3 (All times eastern and subject to change depending on operations)
NASA astronaut and Crew-7 Commander, Jasmin Moghbeli, poses for a photo in the first moments the Crew-7 quartet is onboard the International Space Station after hatch opening on August 27, 2023. Photo credit: NASA
NASA’s SpaceX Crew-7 crew members are settling into their new orbital home aboard the International Space Station while Crew-6 make their own preparations for a safe return to Earth in the coming days.
Crew-7 NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov moved into the space station on Aug. 27. The crew launched on Aug. 26 from Launch Complex 39A at the agency’s Kennedy Space Center in Florida.
Meanwhile, NASA astronauts Stephen Bowen and Woody Hoburg, UAE (United Arab Emirates) astronaut Sultan Alneyadi, and Roscosmos cosmonaut Andrey Fedyaev are wrapping up crew handover activities with Crew-7 which involves concluding science experiments, and transferring return cargo to their Dragon spacecraft. Their spacecraft has been docked with the space station since arriving in March 2023.
NASA and SpaceX are targeting Saturday, Sept. 2, for Crew-6 and SpaceX’s Dragon to undock from the space station and safely splashdown off the coast of Florida on Sunday, Sept. 3. Joint teams are monitoring weather forecasts across seven potential splashdown sites off the coast of Florida and any impacts Hurricane Idalia may have on recovery operations.
The agency will share more information on Crew-6 return as it becomes available.
SpaceX’s Dragon spacecraft, named Endurance, atop the company’s Falcon 9 rocket, stands tall at the pad at Launch Complex 39A at NASA’s Kennedy Space Center in Florida on Monday, Aug. 21, 2023. NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov, who arrived at Kennedy on Sunday, Aug. 20, 2023, will fly to the International Space Station on NASA’s SpaceX Crew-7 mission. Photo credit: SpaceX
NASA and SpaceX are targeting 3:27 a.m. EDT Saturday, Aug. 26, for launch of the agency’s Crew-7 mission to the International Space Station.
Mission managers met on Thursday to discuss the status toward final readiness for a Friday launch opportunity. After performing an extra data review, teams decided to take additional time to reconfirm required factors of safety and operational margin on one of the Dragon spacecraft’s environmental control and life support system (ECLSS) components. The new launch date provides teams additional time to complete the analysis and thoroughly review the necessary data ahead of launch. All ECLSS valves on the Crew-7 and Crew-6 Dragon spacecraft are performing normally, and performed as expected in all preflight testing. Safety continues to be the team’s top priority. The Falcon 9 rocket and Dragon spacecraft remain healthy as teams complete and discuss the final results of this additional analysis, and the crew is ready to fly when the entire team is ready.
For a launch on Saturday, the U.S. Space Force 45th Weather Squadron predicts a 95% chance of favorable weather conditions at the launch pad for liftoff based on Falcon 9 Crew Dragon launch weather criteria.
The Dragon spacecraft carrying NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will launch atop the SpaceX Falcon 9 rocket from Launch Complex 39A at NASA’s Kennedy Space Center in Florida.
The Dragon spacecraft, named Endurance, is scheduled to dock to the space station at 8:50 a.m. Sunday, Aug. 27.
Live coverage of Crew-7 activities begins at 11:30 p.m., Friday, Aug. 25, on NASA Television and the agency’s website. Follow along for details about the mission and NASA’s Commercial Crew Program on the Crew-7 blog, the commercial crew blog,@commercial_crew on X, and commercial crew on Facebook.
NASA’s SpaceX Crew-7 crew members are photographed in the Dragon Endurance spacecraft during a dry dress rehearsal at the agency’s Kennedy Space Center in Florida on Aug. 22, 2023. From left are Roscosmos cosmonaut Konstantin Borisov, ESA (European Space Agency) astronaut Andreas Mogensen, NASA astronaut Jasmin Moghbeli, and JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa. Photo credit: SpaceX
NASA, SpaceX, and international partners have completed the launch readiness review for the agency’s Crew-7 mission to the International Space Station. Crew-7 managers gathered at NASA’s Kennedy Space Center in Florida at 9 p.m. EDT Wednesday to review the SpaceX Falcon 9 rocket and Dragon spacecraft readiness and decided launch is “Go” for liftoff to the space station. Launch now is targeted for 3:50 a.m. EDT Friday, Aug. 25, from Kennedy’s Launch Complex 39A. If needed, a backup launch opportunity is available at 3:27 a.m. Saturday, Aug. 26.
On Wednesday, rocket and ground systems engineering teams completed the detailed data reviews following the integrated static fire of the Falcon 9 rocket conducted the day before at Launch Complex 39A. Falcon 9 performance was normal, resulting in a successful full duration static fire of all nine Merlin first-stage engines.
Operations teams are not tracking any major issues with Falcon 9 or the Dragon spacecraft. NASA and SpaceX spent Wednesday working toward final launch readiness, with remaining work expected to be completed ahead of launch.
The International Space Station Program is monitoring the potential need for a debris avoidance maneuver early afternoon Thursday, Aug. 24, for the orbital outpost. Space station mission control trajectory teams are tracking the debris and determining whether a short duration burn of the station’s thrusters would be required. If needed, the maneuver is not expected to impact the planned arrival of the Roscosmos ISS Progress cargo spacecraft also on Thursday. More information will be provided as orbital trajectory teams review the data and determine whether the debris would fly in the vicinity of the space station requiring a change in station’s altitude.
NASA’s SpaceX Crew-7 crew members arrive at Launch Complex 39A during a dry dress rehearsal at the agency’s Kennedy Space Center in Florida on Aug. 22, 2023. Photo credit: SpaceX
On Tuesday, Crew-7 NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov participated in a rehearsal of launch day activities in preparation for the upcoming Crew-7 launch.
Rehearsal began with launch teams assisting Crew-7 crewmates into their SpaceX spacesuits inside the Astronaut Crew Quarters at Kennedy’s Neil A. Armstrong Operations and Checkout Building – just as they will on launch day. Next, the crew took the elevator down to the ground floor and exited the building’s double doors, where Tesla Model X vehicles were waiting to drive them the short distance to the launch site.
After they arrived at the launch pad, Moghbeli, Mogensen, Furukawa, and Borisov rode the launch tower’s elevator up to the crew access arm – the walkway they will use to enter Dragon, named Endurance. Once securely seated inside, the crew members checked their communications systems and performed seat rotation and suit leak checks. The rehearsal concluded with closure of the spacecraft’s side hatch, which normally occurs about one hour and 25 minutes before liftoff.
Forecasters with Cape Canaveral Space Force Station’s 45th Weather Squadron predict a 90% chance of favorable weather conditions for launch, with the cumulus cloud rule serving as the primary weather concern.
Starting at 11:45 p.m. EDT Thursday, Aug. 24, the live broadcast of the mission – including liftoff and postlaunch milestones – will air on NASA Television and the agency’s website. Check the Crew-7 blog starting at 11 p.m., for key events leading up to launch and through spacecraft separation.
We’ll keep you updated on the key milestones throughout this mission. Details about the mission and NASA’s Commercial Crew Program can be found by following the Crew-7 blog, the commercial crew blog, @commercial_crew on X, and commercial crew on Facebook.
Crew members for NASA’s SpaceX Crew-7 mission to the International Space Station arrive at the Launch and Landing Facility at Kennedy Space Center in Florida on Sunday, Aug. 20, 2023. NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will launch aboard SpaceX’s Dragon spacecraft and Falcon 9 rocket. Liftoff is targeted for 3:49 a.m. EDT Friday, Aug. 25, 2023, from Kennedy’s Launch Complex 39A.
The crew that will soon launch to the International Space Station as part of NASA’s SpaceX Crew-7 mission arrived Sunday at the agency’s Kennedy Space Center in Florida to start final preparations for liftoff.
Crew members NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov, landed via Gulfstream jet aircraft at the Launch and Landing Facility at Kennedy after departing from Ellington Field near the agency’s Johnson Space Center in Houston.
The flight crew will be greeted at arrival by leaders from NASA, JAXA, and ESA.
A media event is scheduled about 12:15 p.m. EDT with the following participants:
Bill Nelson, administrator, NASA
Bob Cabana, associate administrator, NASA
Janet Petro, director, NASA Kennedy
Dana Hutcherson, deputy manager, Commercial Crew Program
Eric van der Wal, lead, International Space Station Program Houston Office, ESA
Junichi Sakai, program manager, International Space Station, JAXA
NASA astronaut Jasmin Moghbeli, spacecraft commander
Roscosmos cosmonaut Konstantin Borisov, mission specialist
The event is scheduled to broadcast live, if weather permits, on NASA Television and the agency’s website. No teleconference option is available for this event.
Crew members are scheduled to lift off at 3:49 a.m. EDT Friday, Aug. 25, aboard a SpaceX Dragon spacecraft carried by a Falcon 9 rocket for a full duration mission to the space station as part of NASA’s Commercial Crew Program (CCP).
This is the seventh crew rotation flight and the eighth human spaceflight mission on SpaceX’s Dragon spacecraft to the International Space Station for CCP. Details about the mission and NASA’s Commercial Crew Program can be found by following the Crew-7 blog, the commercial crew blog, @commercial_crew on X, and commercial crew on Facebook.
NASA’s SpaceX Crew-7 crew members are photographed inside the crew access arm, which they will walk across on launch day to enter SpaceX’s Dragon spacecraft, at NASA Kennedy Space Center’s Launch Complex 39A in Florida during a launch site familiarization tour on July 22, 2023. From left are Roscosmos cosmonaut Konstantin Borisov, mission specialist; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; NASA astronaut Jasmin Moghbeli, commander; and JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, mission specialist. Photo credit: SpaceX
Crew members who will soon fly aboard NASA’s SpaceX Crew-7 mission will enter quarantine Friday in one of the major milestones before they head to the launch site in Florida to start their mission to the International Space Station.
The process of flight crew health stabilization is a routine part of final preparations for all missions to the space station. Spending the final two weeks before liftoff in quarantine will help ensure Crew-7 members are healthy, as well as protect the astronauts already on the space station. During the period, contact with other people are limited during the isolation time to avoid sickness. Family members and some launch and flight team members are cleared before they interact with the crew during this timeframe though most interactions are handled remotely.
Earlier this month, the crew visited the agency’s Kennedy Space Center in Florida for a close look at the spacecraft they will take them to the International Space Station.
NASA’s SpaceX Crew-7 crew members familiarize themselves with SpaceX’s Dragon spacecraft at the company’s refurbishment facility at Cape Canaveral Space Force Station in Florida on July 22, 2023. From left are Roscosmos cosmonaut Konstantin Borisov, mission specialist; ESA astronaut Andreas Mogensen, pilot; NASA astronaut Jasmin Moghbeli, commander; and JAXA astronaut Satoshi Furukawa, mission specialist. Photo credit: SpaceX
Gathered at SpaceX’s refurbishment facility at Cape Canaveral Space Force Station, the four crew members put on their flight suits, entered the spacecraft, performed leak checks and completed communications checkouts.
NASA astronaut Jasmin Moghbeli, commander; ESA (European Space Agency) astronaut Andreas Mogensen, pilot; and mission specialists JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will fly to the space station aboard SpaceX’s Dragon spacecraft, named Endurance, which previously supported the Crew-3 and Crew-5 missions to and from the orbiting laboratory.
The company’s Falcon 9 rocket is targeted to launch Crew-7 no earlier than 3:49 a.m. EDT on Friday, Aug. 25 from Launch Complex 39A at Kennedy. As part of the agency’s Commercial Crew Program, Crew-7 marks the eighth human spaceflight mission supported by a SpaceX Dragon spacecraft and the seventh crew rotation mission to the space station since 2020 for NASA.
The crew also listened to the Dragon spacecraft’s fans and pumps while inside the spacecraft to prepare themselves for the sounds they can expect to hear throughout the flight. They also took additional time to familiarize themselves with the interior of Dragon before leaving the spacecraft.
At SpaceX’s Launch Complex 39A, the crew took a familiarization tour of the launch site, completed emergency training, and rode the elevator to the top of the launch pad’s tower to enjoy a beautiful early morning view of Kennedy.
Follow the commercial crew blog for the latest information on Crew-7 progress and flight readiness as reviews and milestones continue. Details about the mission and NASA’s Commercial Crew Program can be found by following the Crew-7 blog, the commercial crew blog, @commercial_crew on X, and commercial crew on Facebook.
Boeing’s Starliner crew ship approaches the space station on the company’s Orbital Flight Test-2 mission on May 20, 2022. Photo credit: NASA
NASA and Boeing teams continue to make progress in preparing for Starliner’s first crewed flight to and from the International Space Station.
In a media teleconference Aug. 8, leaders from NASA and Boeing discussed the path forward for the spacecraft, including work to address two technical issues identified during the agency’s certification process to ensure the system meets crew safety requirements.
The Starliner team expects to have the Crew Flight Test spacecraft ready in March 2024. A specific target launch date will be set closer to spacecraft readiness, and with consideration of the International Space Station, United Launch Alliance, and Eastern Range availability.
A replay of the teleconference is available on NASA’s YouTube channel.
NASA astronauts Butch Wilmore and Suni Williams are assigned to fly Starliner and United Launch Alliance Atlas V rocket to the International Space Station. The duo will remain docked at the orbiting laboratory for about two weeks to evaluate the new spacecraft and its systems before returning to Earth in the Western United States.
Following a successful first flight with crew, NASA will complete work to certify the Starliner system as an operational crew system for long-duration crew rotation missions to the space station.
Crew-7 astronauts pose in front of their SpaceX Dragon spacecraft recently at the company’s Hawthorne, California, headquarters. The mission to the International Space Station is targeted for launch on Aug. 25 from NASA’s Kennedy Space Center in Florida. Photo credit: SpaceX
The target launch date for NASA’s SpaceX Crew-7 mission to the International Space Station now is 3:49 a.m. EDT Friday, Aug. 25. Additional time was required for teams to complete pad readiness after SpaceX’s recent Falcon Heavy mission lifted off from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The adjustment also takes advantage of consecutive launch opportunities and deconflicts the station’s cargo spacecraft traffic schedule.
NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will launch on a SpaceX Falcon 9 rocket aboard the company’s Dragon spacecraft.
Crew-7 is scheduled to dock to the orbiting laboratory about 2:45 a.m. Saturday, Aug. 26, to the space-facing port of the station’s Harmony module. If needed, Crew-7 has additional launch opportunities on Saturday, Aug. 26 and Sunday, Aug. 27.
Follow NASA’s commercial crew blog for the latest information on Crew-7 flight readiness.
The four crew members of NASA’s SpaceX Crew-7 mission pose for a photo inside SpaceX Hangar X at NASA’s Kennedy Space Center in Florida. From left to right are: Konstantin Borisov, Andreas Mogensen, Jasmin Moghbeli, and Satoshi Furukawa. Photo credit: SpaceX
NASA and SpaceX now are targeting 5:23 a.m. EDT Monday, Aug. 21, for the launch of the agency’s Crew-7 mission to the International Space Station. The adjusted date allows additional time for launch site processing at Launch Complex 39A at NASA’s Kennedy Space Center in Florida. If needed, a backup opportunity is available at 3:49 a.m. on Friday, Aug. 25.
The target date is in coordination with activities aboard the International Space Station, including operations with other crew and cargo spacecraft. A Cygnus cargo spacecraft from Northrop Grumman and Roscosmos Progress cargo spacecraft are due at the station in the coming weeks.
NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, JAXA (Japan Aerospace Exploration Agency) astronaut Satoshi Furukawa, and Roscosmos cosmonaut Konstantin Borisov will fly aboard the SpaceX Dragon spacecraft, named Endurance, which previously flew NASA’s SpaceX Crew-3 and Crew-5 missions to the space station. This will be the first launch of the Falcon 9 booster SpaceX selected to support this mission.
All hardware for the mission has arrived in Florida for processing. On July 25, the Dragon spacecraft was stacked to its trunk ahead of its upcoming transport to SpaceX’s hangar at Launch Complex 39A. Once preflight checkouts of the spacecraft are complete, Dragon will be mated to the rocket ahead of the integrated system’s rollout to the launch pad.
Follow NASA’s commercial crew blog for the latest information on Crew-7 flight readiness.
Crew Flight Test vehicle shown in April prior to going into the Hazardous Processing Area in the Commercial Crew and Cargo Processing Facility. Photo credit: Boeing/John Grant
NASA and Boeing completed a joint Crew Flight Test checkpoint review May 25 ahead of the first flight of Starliner with astronauts to the International Space Station. During the checkpoint, mission teams reviewed open work ahead of launch planned no earlier than July 21, including emerging issues that need a path to closure prior to a decision to fuel the spacecraft in June.
“We are taking a methodical approach to the first crewed flight of Starliner incorporating all of the lessons learned from the various in-depth testing campaigns, including Starliner’s flight tests and the agency’s verification efforts,” said Steve Stich, manager of NASA’s Commercial Crew Program. “All Orbital Flight Test-2 anomalies are closed. In addition to the closeout of ongoing work, the team remains vigilant on tracking new technical issues as we complete certification for crewed flight.”
As part of the ongoing effort, 95% of the Crew Flight Test certification products are complete. This includes approval of Starliner’s crew module batteries, based on additional testing and analysis, along with post-certification flight mitigations and a proposed battery upgrade for future missions. Teams are conducting final spacecraft closeouts and preparing for upcoming hardware milestones, including spacecraft fueling, spacecraft rollout to the launch site, and integration with the United Launch Alliance Atlas V rocket.
While the team continues to work the remaining certification products, they also are working resolution paths on the following items:
Teams will remove and replace a by-pass valve on the active thermal control system, which is located on the Starliner service module and is used to flow coolant into the system to cool the onboard avionics. The Starliner team is replacing the valve that was restricting flow to one of two redundant loops, and running a diagnostic to confirm the suspected issue with the malfunctioning hardware. This work is expected to take about a week with no overall impact to the launch schedule at this time.
Engineers also are working to evaluate any elevated risk from a specific type of tape used on the spacecraft to protect wires from chafing. Although the tape is commonly used in spaceflight, the adhesive properties of the tape could present a flammability risk under certain conditions. NASA and Boeing are evaluating this material and the system’s overall wiring protection to confirm it is acceptable for crewed flight. Those efforts are ongoing and are expected to complete before Boeing begins fueling operations on the spacecraft.
NASA and Boeing also are working to reassess Starliner’s parachute system margins based on new data reviews as part of the ongoing design certification process. Engineers are reviewing the overall efficiency of certain joints within the parachute system to confirm they meet all required factors of safety for crewed flight.
“Crew safety remains the highest priority for NASA and its industry providers, and emerging issues are not uncommon in human spaceflight especially during development,” said Stich. “If you look back two months ago at the work we had ahead of us, it’s almost all complete. The combined team is resilient and resolute in their goal of flying crew on Starliner as soon as it is safe to do so. If a schedule adjustment needs to be made in the future, then we will certainly do that as we have done before. We will only fly when we are ready.”
Starliner spacecraft fueling is expected to begin as early as mid-June, and there is some operational flexibility in that timeline that can be used if needed. Teams will continue to monitor the forward work and determine whether an adjustment in the current launch date is needed. An update on the team’s progress will be provided in the coming weeks.