NASA’s Commercial Crew Program: Boeing Test Flight Dates and SpaceX Demo-2 Update

Illustration of Boeing CST-100 Starliner and SpaceX Crew Dragon in Earth orbit, along with International Space Station and Moon*NASA and Boeing provided updates on Oct. 11, 2019. For the details on Boeing flight tests and the schedule, visit https://go.nasa.gov/328xeSL.

NASA and Boeing are nearing the final stages of development and evaluation for crew systems that will return human spaceflight launches from American soil on missions to the International Space Station as part of the agency’s Commercial Crew Program. To meet NASA’s requirements, the commercial providers must demonstrate that their systems are ready to begin regular flights to the space station.

Boeing now is targeting the company’s uncrewed mission, called Orbital Flight Test, in August 2019, although this is a working target date and to be confirmed. The CST-100 Starliner will launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The decision to adjust the launch date was guided by limited launch opportunities in April and May, as well as a critical U.S. Air Force national security launch – AEHF-5 – atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 in June.

Following the uncrewed flight, Boeing is planning to fly a test mission with crew on board to the space station in late 2019, with the specific date to be confirmed closer to that timeframe. NASA and Boeing have agreed to extend the duration of that flight test to the International Space Station after completing an in-depth technical assessment of the Starliner systems. Boeing also will fly a Pad Abort Test before those two orbital flights to demonstrate the company’s ability to safely carry astronauts away from a launch vehicle emergency, if necessary. Find a full mission and Boeing progress feature here: https://go.nasa.gov/2FM8zcQ.

Following the test flights, NASA will review performance data and resolve any necessary issues to certify the systems for operational missions. NASA and Boeing are actively working to be ready for the operational missions. As with all human spaceflight vehicle development, learning from each test and adjusting as necessary to reduce risk to the crew may override planning dates.

The following planning dates reflect updated schedule inputs for Boeing’s test flights as of March 26, 2019.

Test Flight Planning Dates:
Boeing Pad Abort Test: Summer 2019
Boeing Orbital Flight Test (uncrewed): current target working date August 2019
Boeing Crew Flight Test (crewed): current target working date late 2019

SpaceX Demo-2 Update

NASA also is working with SpaceX to return human spaceflight launches to American soil. The company completed an uncrewed flight test, known as Demo-1, to the space station in March.

NASA’s Commercial Crew Program and SpaceX are reevaluating target test dates.

Demo-1 Post-Splashdown Remarks from Steve Stich

NASA’s Commercial Crew Program Deputy Manager Steve Stich

The following is a transcript of NASA’s Commercial Crew Program Deputy Manager Steve Stich’s comments during the NASA TV broadcast following Crew Dragon splashdown on Friday, March 8:

It’s great to be here representing the Commercial Crew Program. What an outstanding day to be part of our program. We started our contracts in 2014 for these first missions, and to sit here today and talk about Demo-1 and how great the flight went and what we’re going to learn from it is just amazing.

I’d like to congratulate the SpaceX team on a phenomenal job getting the vehicles ready and executing the flight, and our whole NASA team that worked the mission. If you just think about the enormity of what happened in this flight and all of the prep that went into it—getting the pad refurbished at (Launch Complex) 39A, getting the flight control room set up, getting the vehicles built, getting the Falcon 9 ready, all of the analysis, all of the mission support that went into it, the simulations and the practice leading up to this flight over the last year or so—it’s just been a tremendous job.

I would say one of the things that we learned during this flight is the great relationship we have between the program and SpaceX. I would say our teams worked seamlessly back and forth with SpaceX, not only in the lead-up to the flight but in how we managed the flight through the Dragon mission management team, and then also working with Kenny Todd and the International Space Station Program. The space station program did a phenomenal job supporting our program while we were docked to station, on the way to station, and the international partnership as well, so it was a really great opportunity for this mission.

The last 24 hours have been exciting for us. You know we closed the hatch yesterday around noon (Central Time), got into the undock today around 1:31 a.m. (Central Time), did a few small separation burns to get away from station—if you watched that on NASA TV that was flawless—did about three separation burns to get down below station, executed the deorbit burn at about 6:52 a.m. Central Time and then landed just a few minutes ago at 7:45 a.m. (Central Time).

The vehicle is doing well. The recovery crews are out on the scene. They’ve already been around the spacecraft and made sure it was secure for personnel. It was a very calm day with low winds and low sea states, and one of the chutes kind of landed on the Dragon capsule; they’ve already gotten that off, so that’s going really well.  It’ll probably take 30 minutes to maybe an hour to get it back on the ship.

When you look overall at this mission, it was a great dress rehearsal for Demo-2. We learned a phenomenal amount in the prelaunch timeframe about how to load the vehicle, and thinking forward to how we’ll put the crews in the vehicle. The ascent profile for this flight, we practiced the exact profile that Mike Hopkins and others will fly very soon—Doug Hurley and Bob Behnken (on Demo-2). We had the abort system—the crew escape system on Dragon—actually enabled for this flight, and we were able to see how that worked and we’ll get the data back and look at those triggers and how it performed.

On-orbit we got a lot of great data on the vehicle in terms of the thermal performance and power performance; the vehicle really did better than we expected. Then the rendezvous was phenomenal as we came in and checked out those sensors. During the attached phase of course we had cargo operations, and we’ll do the same thing both on Demo-2 and then Crew Dragon-1 and other missions. Then we did a robotic survey of the vehicle to look at the thermal protection system and other systems, and that went really well.

I will say one thing: this mission, it was only six days long. It was a sprint from start to finish, and thinking about where we’ve been in operations in that sprint, I think Kenny (Todd) would probably tell you the same thing—it was just a phenomenal job by the team. And then of course today, the undocking, watching how those systems performed, that went flawlessly. It’s a very tight sequence between undocking and de-orbit burn, how the nose cone performed, how the de-orbit burn was executed, then the entry was phenomenal.

We did have Ripley on board, an anthropomorphic test device, and that’s going to give us a lot of important data for the accelerations during both the ascent phase and then the entry phase under the parachutes and then landing. So we’ll collect that data, and then look at that.

Over the next few weeks, we’ll be doing post-flight reviews. In fact just next week we’ll have one for the launch vehicle and the ground segment at Kennedy Space Center (KSC), we’ll start reviewing that. And then subsequently we’ll do reviews with SpaceX on the orbit phase of the mission.

This flight really sets us up well for the rest of the year. The vehicle that’s hit the water in the Atlantic today will be the in-flight abort vehicle, and so one of the first things that’ll happen is the vehicle will come back to KSC and go over into the processing area and start getting refurbished for the in-flight abort test which should be in the June timeframe. And then the Demo-2 vehicle is in Hawthorne, CA getting ready for the first crewed mission. That’s in progress and going well. That work has continued all through the flight, so it will be a busy year for us with SpaceX with in-flight abort in the June timeframe and then Demo-2 later in the year with the first crewed mission.

I don’t think we saw really anything in the mission so far—and we’ve got to do to the data reviews—that would preclude us from having the crewed mission later this year.

If you look in the April timeframe we’re also getting ready for the Orbital Flight Test for Boeing, and that will happen very soon. So our program will transition after this mission and the data reviews into preparing not only for in-flight abort and Demo-2, but also the Orbital Flight Test—the uncrewed flight test—for Boeing, and that’ll be coming up in the April timeframe. Spacecraft 3, which is the Boeing vehicle, is coming together at the Commercial Crew and Cargo Processing Facility down in Florida. And (Boeing) is in the middle of a bunch of very critical testing right now out at El Segundo (California) to verify that the spacecraft can work successfully in space. And then later on this year we’ll have the Crew Flight Test for Boeing as well.

If you just look at all the activities in commercial crew, it’s a super busy time. In addition to this flight, in the last few weeks we did parachute tests for SpaceX and Boeing and so if you look at all of the activities to get ready for flying our crews, it’s just a very exciting time.

Again, congratulations to our SpaceX team and all of the NASA people across the country that worked so hard for many, many years on this flight. It really sets us up for the rest of the year, and it’s a super exciting time to be in commercial crew.

Partnerships Spur Industry for Flourishing Space Commerce

Throughout NASA’s history, the agency has worked with industry and academia to explore and utilize the space frontier. Contractors built rockets, satellites and spacecraft. Colleges and universities have worked with NASA scientists and engineers to develop technology to support investigations leading to discoveries.

As the 30-year Space Shuttle Program was drawing to a close, NASA again began plans to reach beyond low-Earth orbit. To allow a focus on exploration to the Moon and Mars, NASA has entered into partnerships with industry opening a variety of new opportunities.

A little more than two years after the final shuttle flight, SpaceX’s Dragon and Northrop Grumman’s Cygnus spacecraft began successfully launching atop their company’s Falcon 9 and Antares rockets to resupply the International Space Station. The companies developed the rockets and spacecraft through public-private partnerships under the agency’s commercial resupply services contracts.

Sierra Nevada Corp’s Dream Chaser

More recently, NASA selected Sierra Nevada Corporation’s Dream Chaser spacecraft to join with Northrop Grumman and SpaceX, in delivering critical science, research and technology experiments to the space station for the agency’s second commercial resupply contracts from 2019 to 2024.

Additionally, NASA formed the Commercial Crew Program (CCP) to facilitate the development of a U.S. commercial crew space transportation capability with the goal of achieving safe, reliable and cost-effective access to and from the space station and other destinations in low-Earth orbit.

Boeing’s CST-100 Starliner

In September 2014, NASA announced the selection of Boeing and SpaceX to transport U.S. crews to and from the space station aboard their CST-100 Starliner and Crew Dragon spacecraft, respectively. This will end the nation’s reliance on Russia to transport crews to the orbiting laboratory. Boeing’s Starliner will launch atop a United Launch Alliance Atlas V rocket and SpaceX Falcon 9 will power the company’s Crew Dragon to orbit.

SpaceX’s Crew Dragon at Launch Complex 39A

The first uncrewed Demo-1 test flight of the Crew Dragon is slated for March 2, 2019 and the Starliner’s uncrewed Orbital Flight Test is planned for no earlier than April 2019. The inaugural crewed missions of the Crew Dragon and Starliner are set to take place later this year.

The flourishing U.S. space industry continues its growth with Blue Origin building a facility to manufacture and launch reusable rockets from just outside the gates of NASA’s Kennedy Space Center. For launch operations, Blue Origin plans to refurbish Space Launch Complex 36 at Cape Canaveral Air Force Station, a no-longer-needed Atlas II launch pad. This is the first time an entire rocket system will be built and processed on Florida’s Space Coast.

NASA’s Commercial Crew Program on the Verge of Making History

NASA’s Commercial Crew Program (CCP) and private industry partners, Boeing and SpaceX, are on the verge of making history with the return of human spaceflight launches to the International Space Station from United States soil.

The upcoming flights of the SpaceX Crew Dragon and Boeing CST-100 Starliner spacecraft will be the first time NASA has sent astronauts to space on systems owned, built, tested and operated by private companies. By allowing industry to provide transportation services to the space station, the agency can concentrate on developing emerging technologies for exploring distant destinations well beyond low-Earth orbit such as the Moon and Mars.

In September 2014, the agency announced the selection of Boeing and SpaceX to transport U.S. crews to and from the space station. This also will mark the return of launching U.S. astronauts on American spacecraft and rockets to low-Earth orbit since the final space shuttle mission in 2011.

The inaugural flight of SpaceX’s Crew Dragon, known as Demo-1, will be uncrewed and is designed to validate end-to-end systems and capabilities, leading to certification to fly a crew. SpaceX’s first crewed flight, Demo-2, will fully demonstrate the company’s ability to safely fly NASA astronauts Bob Behnken and Doug Hurley to the space station. Behnken and Hurley have each flown two space shuttle missions.

In the near future, the uncrewed, opening act for Boeing’s Starliner, known as its Orbital Flight Test, will demonstrate the human transportation capabilities in advance of certification to fly astronauts to space. The first flight with crew aboard a Starliner, the Crew Flight Test, will fully demonstrate Boeing’s ability to fly humans safely to and from the International Space Station. Onboard will be NASA astronaut Mike Finke, a veteran of three spaceflights; NASA astronaut Nicole Mann; and Boeing astronaut Chris Ferguson, who previously led Starliner’s Crew and Mission Systems and flew three space shuttle missions.

CCP will provide safe, reliable and cost-effective access to low-Earth orbit destinations, and it will end reliance on Russian Soyuz spacecraft. As a result, the station’s current crew of six can grow, enabling more research aboard the unique microgravity laboratory.

Launch Teams Simulate Boeing Uncrewed Flight Test Countdown

NASA astronaut Mike Fincke monitors Boeing’s Orbital Flight Test (OFT) launch simulation. Fincke is assigned to Boeing’s Crew Flight Test, the first crewed flight of Boeing’s CST-100 Starliner following OFT.

In preparation for Boeing’s uncrewed test flight of its CST-100 Starliner spacecraft, designed to carry astronauts to the International Space Station, NASA, United Launch Alliance (ULA), Boeing and Department of Defense personnel conducted a successful integrated crew exercise on Feb. 12.

NASA Operations Integration Manager Michael Hess

Boeing’s Orbital Flight Test (OFT) of Starliner will launch on a ULA Atlas V rocket from Space Launch Complex-41 at Cape Canaveral Air Force Station, Florida. The joint team executed a mock countdown that practiced fueling the Atlas V and operating the unique launch day timeline that features a four-hour built-in hold to allow launch teams to work any technical issues that arise in the countdown. The hold is lifted four minutes prior to launch.

NASA OFT Mission Manager Eugene “Trip” Healey

The team was presented with simulated issues with hardware and downrange assets to exercise troubleshooting, problem resolution procedures and the coordination that goes into adjusting the countdown as necessary. There were even simulated challenges from the weather, forcing officials to react to changing weather conditions at the pad. The exercise culminated with a successful liftoff and climb into space.

Boeing Spacecraft Launch Conductor Louis Atchison

Formal rehearsals like this one allow launch teams in geographic locations across the country to function as one well-coordinated team.

Steve Payne, Launch Integration Manager for NASA’s Commercial Crew Program

OFT will be the uncrewed test of Starliner as part of NASA’s Commercial Crew Program, during which Starliner will fly to the International Space Station for an automated rendezvous and docking, complete a short stay and then return to Earth; the mission is the precursor to Boeing’s flight test with crew.

You can find the latest targeted launch dates for Commercial Crew missions at https://blogs.nasa.gov/commercialcrew/2019/02/06/nasa-partners-update-commercial-crew-launch-dates/.

NASA, Partners Update Commercial Crew Launch Dates

*NASA and Boeing provided updates on Oct. 11, 2019. For the details on Boeing flight tests and the schedule, visit https://go.nasa.gov/328xeSL.

NASA and its Commercial Crew Program providers Boeing and SpaceX have agreed to move the target launch dates for the upcoming inaugural test flights of their next generation American spacecraft and rockets that will launch astronauts to the International Space Station.

The agency now is targeting March 2 for launch of SpaceX’s Crew Dragon on its uncrewed Demo-1 test flight. Boeing’s uncrewed Orbital Flight Test is targeted for launch no earlier than April.

These adjustments allow for completion of necessary hardware testing, data verification, remaining NASA and provider reviews, as well as training of flight controllers and mission managers.

The uncrewed test flights will be the first time commercially-built and operated American spacecraft designed for humans will dock to the space station. The first flights are dress rehearsals for missions with astronauts aboard the vehicles. Commercial crew has continued working toward these historic missions throughout the month of January.

SpaceX Demo-1 static fire
SpaceX Demo-1 static fire

“The uncrewed flight tests are a great dry run for not only our hardware, but for our team to get ready for our crewed flight tests,” said Kathy Lueders, Commercial Crew Program manager. “NASA has been working together with SpaceX and Boeing to make sure we are ready to conduct these test flights and get ready to learn critical information that will further help us to fly our crews safely. We always learn from tests.”

In January, SpaceX successfully completed a static fire test of its Falcon 9 with Crew Dragon atop the rocket at Kennedy Space Center’s Launch Complex 39A in Florida, in preparation for Demo-1.

Boeing's CST-100 Starliner
Boeing’s CST-100 Starliner

Boeing’s CST-100 Starliner continues to undergo testing in preparation for its Orbital Flight Test, and United Launch Alliance is conducting final processing of the Atlas V rocket that will launch Starliner from Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida.

“There still are many critical steps to complete before launch and while we eagerly are anticipating these launches, we will step through our test flight preparations and readiness reviews,” said Lueders. “We are excited about seeing the hardware we have followed through development, integration, and ground testing move into flight.”

NASA’s Commercial Crew Program will return human spaceflight launches to U.S. soil, providing safe, reliable and cost-effective access to low-Earth orbit and the space station on systems that meet safety and performance requirements.

To meet NASA’s requirements, the commercial providers must demonstrate their systems are ready to begin regular flights to the space station. After the uncrewed flight tests, Boeing and SpaceX will complete a flight test with crew prior to being certified by NASA for crew rotation missions. The following planning dates reflect inputs by the Commercial Crew Program and the two companies and are current as of Feb. 4, 2019.

Test Flight Planning Dates:
SpaceX Demo-1 (uncrewed): March 2, 2019
Boeing Orbital Flight Test (uncrewed): NET April 2019
Boeing Pad Abort Test: NET May 2019
SpaceX In-Flight Abort Test: June 2019
SpaceX Demo-2 (crewed): July 2019
Boeing Crew Flight Test (crewed): NET August 2019

SpaceX also completed a pad abort test in 2015. Following the test flights, NASA will review performance data and resolve any necessary issues to certify the systems for operational missions. Boeing, SpaceX and the Commercial Crew Program are actively working to be ready for the operational missions. As with all human spaceflight vehicle development, learning from each test and adjusting as necessary to reduce risk to the crew may override planning dates.

NASA Announces Updated Crew Assignment for Boeing Flight Test

Astronaut Edward M. (Mike) Fincke, Expedition 9 NASA ISS science officer and flight engineer, performs one of multiple tests of the Capillary Flow Experiment investigation in the Destiny laboratory of the International Space Station in September 2004.
Astronaut Edward M. (Mike) Fincke, Expedition 9 NASA ISS science officer and flight engineer, performs one of multiple tests of the Capillary Flow Experiment investigation in the Destiny laboratory of the International Space Station in September 2004. Photo credit: NASA

NASA astronaut E. Michael “Mike” Fincke has been added to the crew of the Boeing CST-100 Starliner’s Crew Flight Test, scheduled to launch later this year.

Fincke takes the place of astronaut Eric Boe, originally assigned to the mission in August 2018. Boe is unable to fly due to medical reasons; he will replace Fincke as the assistant to the chief for commercial crew in the astronaut office at NASA’s Johnson Space Center.

Fincke will begin training immediately alongside NASA’s Nicole Mann and Boeing’s Chris Ferguson, who were both assigned to the mission in August 2018.

The Starliner’s Crew Flight Test will be the first time that the new spacecraft, which is being developed and built by Boeing as part of NASA’s Commercial Crew Program, is launched into space with humans on board.

For more information: https://go.nasa.gov/2UaSBOV.

First Starliner to Launch Crew Ready for Environmental Testing

Boeing technicians carefully close Starliner’s shipping container at the company’s Florida factory ahead of its trip to El Segundo, Calif.

The Boeing CST-100 Starliner spacecraft destined to fly astronauts to the International Space Station for Boeing’s Crew Flight Test (CFT) as part of NASA’s Commercial Crew Program is ready to undergo a series of flight-like simulations similar to the actual environments the spacecraft will experience during different stages of flight.

Boeing’s first crewed Starliner finished initial production at Kennedy Space Center, Fla. and is readied for its cross-country trip.

The spacecraft recently arrived at the company’s facilities in El Segundo, California for the series of tests. In order to ship the spacecraft, technicians painstakingly prepared and secured Starliner inside its shipping container on Nov. 12, before the spacecraft completed its 10-day, cross-country trip.

Now, Starliner will begin the test campaign wherein acoustic and vibration testing will simulate the environment during launch and ascent, thermal vacuum testing will expose Starliner to the extreme heat and cold it will experience in orbit, and electromagnetic interference/electromagnetic compatibility testing will make sure that those signals or radiation do not interfere with operations on Starliner or with sensitive equipment on station. The series of tests are expected to last about three months.

Starliner is unboxed inside Boeing’s satellite test facilities in California to prepare for environmental qualification testing.

The company’s CFT is targeted for August 2019, and will be Starliner’s first flight with crew onboard. Following the CFT, Boeing will refurbish the spacecraft for regular crewed missions to the space station.

During these environmental tests, Boeing also expects to complete production in its Florida factory on the Starliner to be flown in the company’s uncrewed Orbital Flight Test, targeted for March 2019.

The shipping container with Starliner’s crew module arrives at Boeing’s facilities in El Segundo, Calif.

Boeing is developing the Starliner spacecraft as part of NASA’s Commercial Crew Program. The spacecraft will launch on a United Launch Alliance Atlas V rocket from Space Launch Complex 41 on Cape Canaveral Air Force Station in Florida.

NASA’s Commercial Crew Program Target Test Flight Dates

*NASA and Boeing provided updates on Oct. 11, 2019. For the details on Boeing flight tests and the schedule, visit https://go.nasa.gov/328xeSL.

The next generation of American spacecraft and rockets that will launch astronauts to the International Space Station are nearing the final stages of development and evaluation. NASA’s Commercial Crew Program will return human spaceflight launches to U.S. soil, providing safe, reliable and cost-effective access to low-Earth orbit on systems that meet our safety and mission requirements.

To meet NASA’s requirements, the commercial providers must demonstrate that their systems are ready to begin regular flights to the space station. Two of those demonstrations are uncrewed flight tests, known as Orbital Flight Test for Boeing, and Demo-1 for SpaceX. After the uncrewed flight tests, both companies will carry out spacecraft abort tests to demonstrate their crew escape capability during an actual on-pad, or ascent emergency. The final test flights for each company will be crew flight tests to the space station prior to being certified by NASA for crew rotation missions. The following target dates reflect the current schedule as of Thursday, Jan. 10.

Test Flight Planning Dates:
Boeing Orbital Flight Test (uncrewed): March 2019
Boeing Pad Abort Test: Between OFT and CFT
Boeing Crew Flight Test (crewed): August 2019
SpaceX Demo-1 (uncrewed): No earlier than February 2019
SpaceX In-Flight Abort Test: Between Demo-1 and Demo-2
SpaceX Demo-2 (crewed): June 2019

SpaceX also completed a pad abort test in 2015. Following the test flights, NASA will review the performance data and resolve issues as necessary to certify the systems for operational missions.  Boeing, SpaceX and the Commercial Crew Program are actively working to be ready for the operational missions; however, as with all human spaceflight development, learning from each test and adjusting as necessary to reduce risk to the crew may override planning dates.

Anticipated Readiness Dates for Operational Missions:
First operational mission: August 2019
Second operational mission: December 2019

For more information, see https://go.nasa.gov/2QwW3Sd.