Mission Specialist Assigned to Crew-7 Space Station Mission

Crew-7 is pictured at SpaceX wearing their SpaceX flight suits.
The four crew members who comprise the SpaceX Crew-7 mission pose for a photo in their spacesuits during a training session at the company’s headquarters in Hawthorne, California. From left are, Mission Specialist Konstantin Borisov, Pilot Andreas Mogensen, Commander Jasmin Moghbeli,, and Mission Specialist Satoshi Furukawa. Photo credit: SpaceX

The final crew member for NASA’s SpaceX Crew-7 mission, currently targeted to launch to the International Space Station in mid-August, has been announced.

Roscosmos cosmonaut Konstantin Borisov will fly as a mission specialist on SpaceX’s seventh rotational mission to the orbiting laboratory for NASA.

Borisov joins previously named crew members NASA astronaut Jasmin Moghbeli, ESA (European Space Agency) astronaut Andreas Mogensen, and astronaut Satoshi Furukawa from JAXA (Japan Aerospace Exploration Agency).

This will be the first spaceflight for Borisov, who entered the Roscosmos Cosmonaut Corps as a test cosmonaut candidate in 2018.

A SpaceX Falcon 9 rocket will launch Crew-7 aboard a Dragon spacecraft, named Endurance, from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The spacecraft previously flew NASA’s SpaceX Crew-3 and Crew-5 missions.

NASA and Roscosmos fly integrated crews on U.S. crew spacecraft and on the Soyuz spacecraft to ensure continued safe operations of the International Space Station and the safety of its crew. Integrated crews have been the norm throughout the International Space Station Program, as five space agencies (the Canadian Space Agency, the European Space Agency, the Japan Aerospace Exploration Agency, NASA, and Roscosmos) operate the station, with each space agency responsible for managing and controlling the hardware it provides. The station was designed to be interdependent and relies on contributions from each space agency to function. No one agency has the capability to function independent of the others. For continued safe operations of the space station, the integrated crew agreement helps ensure that each crewed spacecraft docked to the station includes an integrated crew with trained crew members in both the Russian and U.S. Operating Segment systems.

For more insight on NASA’s Commercial Crew Program missions to the space station follow the commercial crew blog. More details can be found @commercial_crew on Twitter and commercial crew on Facebook.

NASA, Boeing Teams Achieve Milestone Ahead of Crewed Flight

NASA's Boeing Crew Flight Test AMR rehearsal
From left, Starliner Flight Crew Integration Manager Tony Ceccacci, and NASA astronauts Barry “Butch” Wilmore and Sunita “Suni” Williams participate in a mission rehearsal at Boeing’s Avionics and Software Integration Lab in Houston. Photo credit: Boeing/Steven Siceloff

NASA and Boeing recently completed a full start to finish integrated mission dress rehearsal for the company’s CST-100 Starliner flight with astronauts to the International Space Station, which is scheduled to launch in April 2023.

The Crew Flight Test, or CFT, will launch NASA astronauts Barry “Butch” Wilmore and Suni Williams on Starliner – atop a United Launch Alliance Atlas V rocket – from Space Launch Complex-41 at Cape Canaveral Space Force Station as part of the agency’s Commercial Crew Program.

During several days at Boeing’s Avionics and Software Integration Lab (ASIL) in Houston, the ASIL Mission Rehearsal (AMR) combined tests of software and crew systems, along with operations teams. The completion of the end-to-end mission rehearsal clears a path for the next CFT milestones, including working with the crew and flight controllers on various integrated failure scenarios and a series of flight-day parameter updates that will become available as the team nears launch day.

“Testing is a key component to the success of a human space program,” said NASA Commercial Crew Program Software Certification Manager Chad Schaeffer. “The AMR and the integrated failure scenarios are excellent examples of the rigorous testing teams are performing on Starliner. The rehearsal went well and reflects the continued improvement in executing this test and helps pave the way to the much anticipated first crewed flight.”

During the rehearsal, Wilmore and Williams, along with fellow NASA astronaut Mike Fincke, worked through mission milestones in coordination with mission operations teams located inside flight control rooms at NASA’s Johnson Space Center. Starliner engineering teammates also supported from Boeing’s Mission Control Center located in Florida.

The crew members worked in a flight deck simulator networked to control rooms and avionics, operating the same software that will be used during CFT. They effectively demonstrated the software is ready to operate Starliner during prelaunch, launch, docking to the space station, undocking, and the return to Earth through landing.

The AMR provided end-to-end testing of hardware configuration, software, communications, preparation configuring hardware and software, routing communications channels, and mapping simulated sensor data. Similar testing was performed ahead of NASA and Boeing’s Orbital Flight Test-2 (OFT-2) uncrewed mission in early 2022.

“We began conducting AMRs with the creation of OFT-2, and the integrated team has continued to get more efficient with each rehearsal,” said Aaron Kraftcheck, Starliner avionics software integration and test manager. “With the participation of our astronauts in this CFT AMR, we have enhanced the team dynamics, and continued to learn and adjust, which is what AMR is all about.”

Atlas V Rocket Assembled for Starliner Launch to International Space Station

United Launch Alliance Atlas V rocket
Engineers in United Launch Alliance’s Vertical Integration Facility used large cranes to assemble the stages of the company’s Atlas V rocket, in preparation for Boeing’s Orbital Flight Test-2 (OFT-2) launch to the International Space Station. Photo credit: United Launch Alliance

United Launch Alliance’s (ULA) Atlas V rocket is assembled in preparation for Boeing’s Orbital Flight Test-2 (OFT-2) launch to the International Space Station as part of NASA’s Commercial Crew Program.

Engineers in ULA’s Vertical Integration Facility (VIF) used large cranes to assemble the stages of the rocket in an upright position on its mobile launch platform, which will carry the Atlas V and Starliner from the VIF to the pad for launch.

To verify the rocket is ready to launch, technicians will soon power the Atlas V to test flight controls, check the engine steering profiles, and conduct a combined systems test.

The 172-foot-tall rocket will be fully completed when the Starliner is mounted aboard the Atlas V. A ULA payload transporter will move the capsule from Boeing’s Commercial Crew and Cargo Processing Facility (C3PF) at the Kennedy Space Center to the nearby VIF for attachment.

The Atlas V will propel Starliner off the pad on 1.6 million pounds of thrust on its second uncrewed flight test from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida no earlier than July 30.

As Boeing’s second uncrewed flight for NASA’s Commercial Crew Program, OFT-2 will serve as an end-to-end flight test to prove the Atlas V rocket and Starliner are ready for regular missions launching astronauts to and from the space station.

Learn more about ULA’s Atlas V and stacking.

More details about NASA’s Commercial Crew Program can be found by following the commercial crew blog@commercial_crew and commercial crew on Facebook.

Crew-1 Flight Readiness Review Underway; Virtual Crew Media Engagement on NASA TV

NASA and SpaceX managers are gathered this morning to begin the Crew-1 mission’s Flight Readiness Review at the agency’s Kennedy Space Center in Florida. The review focuses on the preparedness of SpaceX’s crew transportation system, the International Space Station, and its international partners to support the flight, and the certification of flight readiness.

The SpaceX Crew-1 official crew insignia features a dragon in silhouette, a Crew Dragon spacecraft, and the numeral 1 for Crew-1.Kathy Lueders, associate administrator for NASA’s Human Exploration and Operations Mission Directorate, is leading the review. Hans Koenigsmann, vice president for Build and Flight Reliability, is the senior SpaceX official.

The teams also have additional time on Tuesday, Nov. 10, to complete the review. Approximately one hour after the review ends, the agency will hold a media teleconference with the following participants:

  • Kathy Lueders, associate administrator, Human Exploration and Operations Mission Directorate, NASA Headquarters
  • Steve Stich, manager, Commercial Crew Program, Kennedy
  • Joel Montalbano, manager, International Space Station, Johnson
  • Norm Knight, deputy manager, Flight Operations Directorate, Johnson
  • Benji Reed, senior director, Human Spaceflight Programs, SpaceX
  • Junichi Sakai, manager, International Space Station Program, JAXA
  • FAA representative

Also, tune in to NASA Television or the agency’s website at 1:15 p.m. EST today for a Virtual Crew Media Engagement at Kennedy with the Crew-1 astronauts who will answer questions live from the Astronaut Crew Quarters inside Kennedy’s Neil Armstrong Operations & Checkout Building.

NASA astronauts Michael Hopkins, Victor Glover, and Shannon Walker, along with Soichi Noguchi of the Japan Aerospace Exploration Agency (JAXA), will launch on SpaceX’s Falcon 9 rocket and Crew Dragon spacecraft on the first crew rotation mission to the International Space Station as part of NASA’s Commercial Crew Program. Liftoff is scheduled for Saturday, Nov. 14, at 7:49 EST, from Launch Complex 39A at Kennedy.

SpaceX In-Flight Abort: Launch Readiness Review Complete, Weather 90% ‘Go’ for Test

SpaceX Demo-1 Preflight
A SpaceX Falcon 9 rocket with the company’s Crew Dragon spacecraft onboard is seen at Launch Complex 39A during preparations for the Demo-1 mission on March 1, 2019 at Kennedy Space Center in Florida. NASA and SpaceX will launch an in-flight abort test with Crew Dragon on Saturday, Jan. 18, 2020. Photo credit: NASA

Teams from NASA and SpaceX are “go” for launch following today’s launch readiness review ahead the company’s in-flight abort test as part of NASA’s Commercial Crew Program.

Launch is scheduled for 8 a.m. EST Saturday, Jan. 18, from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The flight test is planned to demonstrate Crew Dragon’s ability to safely escape the Falcon 9 rocket in the event of a failure during launch.

Watch the pre-test news conference at 1 p.m. on Friday, Jan. 17, on NASA TV and the agency’s website. The participants include:

  • Kathy Lueders, manager, NASA Commercial Crew Program
  • Benji Reed, director, Crew Mission Management, SpaceX
  • Mike McAleenan, launch weather officer, 45th Weather Squadron

Meteorologists with the U.S. Air Force 45th Space Wing predict a 90% chance of favorable weather, with the primary concerns for launch day being the flight through precipitation rule during the four-hour launch window.

More details about the mission and NASA’s Commercial Crew Program can be found in the press kit online at https://www.nasa.gov/specials/ccp-press-kit/main.html and by following the commercial crew blog, @commercial_crew and commercial crew on Facebook.

Flight Readiness Review Begins for Boeing’s Orbital Flight Test

Wet dress rehearsal for OFT
The United Launch Alliance Atlas V rocket, topped by the Boeing CST-100 Starliner spacecraft, stands on the launch pad at Space Launch Complex 41 at Florida’s Cape Canaveral Air Force Station on Friday, Dec. 6, during a wet dress rehearsal for Boeing’s Orbital Flight Test. Image credit: NASA

NASA and Boeing are holding a Flight Readiness Review (FRR) today at the agency’s Kennedy Space Center in Florida in preparation for Boeing’s uncrewed Orbital Flight Test as part of NASA’s Commercial Crew Program. The review provides NASA and Boeing the opportunity to assess the mission status and work that needs to be completed prior to the critical flight test.

Ken Bowersox, deputy associate administrator for Human Exploration and Operations at NASA Headquarters, is leading the meeting. The senior Boeing official at the review is Jim Chilton, senior vice president, Boeing Space and Launch.

Teams have gathered from across the agency and Boeing to hear presentations from key mission managers. The FRR is an in-depth assessment on the readiness of flight for Boeing’s CST-100 Starliner spacecraft and systems, mission operations, support functions and readiness of the space station program to support Starliner’s maiden mission to the International Space Station. The meeting will conclude with a poll of all members of the review board.

Starliner will launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 on Cape Canaveral Air Force Station in Florida to rendezvous and dock with the orbiting laboratory. Launch is targeted for Friday, Dec. 20.

The flight test will provide valuable data NASA will review as part of the process to certify Boeing’s crew transportation system is as safe as possible for carrying astronauts to and from the space station.

The Atlas V to Lift Starliner with Astronauts Departs Factory for Launch Site

From the manufacturing facility in Decatur, Alabama, the Atlas V booster stage and Dual Engine Centaur upper stage were rolled into a giant cargo ship for transport to Cape Canaveral, Florida. Photo credit: NASA/Emmett Given

The United Launch Alliance Atlas V rocket that will launch Boeing’s CST-100 Starliner on the Crew Flight Test (CFT) mission to the International Space Station for NASA’s Commercial Crew Program emerged on Thursday from the production factory in Decatur, Alabama for transport in a giant cargo ship to Cape Canaveral Air Force Station in Florida.

Once at Cape Canaveral Air Force Station in Florida, the United Launch Alliance Atlas V rocket will begin integrated operations and processing for the Crew Flight Test mission. Photo credit: NASA/Emmett Given

The rocket, known as AV-082, will launch Starliner and its crew of NASA astronauts Mike Fincke and Nicole Mann, and Boeing astronaut Chris Ferguson to the  station following the spacecraft’s maiden voyage, the uncrewed Orbital Flight Test targeted for August.

From the manufacturing facility in Decatur, Alabama, the Atlas V booster stage and Dual Engine Centaur upper stage were moved down the road for loading into the Mariner vessel docked nearby. The 312-foot-long ship is purpose-built to navigate both shallow waters of rivers and ocean travel to reach ULA’s launch sites. It has been making the trek from Decatur to Cape Canaveral since 2001.

Once at Cape Canaveral, the Atlas V will begin integrated operations and processing for the CFT launch.

NASA selected Boeing and SpaceX to transport crew to the space station from the United States, returning the nation’s human spaceflight launch capability. These integrated spacecraft, rockets and associated systems will carry up to four astronauts on NASA missions.

Regular commercial transportation using Boeing’s Starliner and SpaceX’s Crew Dragon spacecraft to and from the station will enable expanded station use and additional research time aboard the orbiting laboratory. Research on the space station helps address the challenges of moving humanity forward to the Moon and Mars as we learn how to keep astronauts healthy during long-duration space travel and demonstrate technologies for human and robotic exploration beyond low-Earth orbit.